Kartik 2075
- Dismantling temporary structure of Gorakhnath Mandap was carried out.
- Total station survey of the foundation walls of Kasthamandap was carried out by Graphic Survey and Design Consult.
- The old timber members of other temples that was previously stored inside KRC Office premise was being moved to Dakh Chowk inside Hanuman Dhoka Durbar premise. The old meths of Kasthamandap that was stored inside Hanuman Dhoka premise were shifted to KRC Office premise.
- Resistograph test of sorted old timber members of Kasthamandap was carried out.
- Revised report on structural analysis of Kasthamandap was submitted by Resilient Structures Pvt. Ltd.